Skip to content
PROTOTYPE — MOCK DATAFigures are generated fixtures derived from the registry. Not ACF actuals.
Menu (13)
?
Vu Tuan Minh (CEO)
exec · read-only
Layers
L1, L2, L3
Scope
ACF and below
Packs in scope
13 of 13
Employee record
— a role, not a person

Clears the persona and returns you to the default reader. At fullstack this is Entra ID (A-21) and the identity stops being a cookie.

L3 · DEPARTMENT

System Infrastructure & Operations

Layer 3 — a department. Its scorecard is a metric pack.

12
METRICS AT OR BELOW
4
SCORABLE
4
OFF TARGET OR STALE
20
SCORE
?
HEADCOUNT

What is measured here — IT Infrastructure & Operations

Open the IT Infrastructure & Operations pack →
DR test currency
IT-12
8.6
Off target-171.4 vs 180
MANUALDR records⏱ T+1P3

Head of Infrastructure & Operations·IT System Planning

Achieved RTO / RPO at last DR test
IT-08
—
No data
no series
UNMEASUREDDR test record○ NOT REPORTEDP3

Head of Infrastructure & Operations·IT System Planning

Incident volume by root cause
IT-06
5.4
No target
MANAGEDManageEngine SDP⏱ T+1P3

Head of Infrastructure & Operations·IT System Planning

P1 incident response vs SLA
IT-04
0.7%
Off target-94.3pp vs 95.0%
MANAGEDManageEngine SDP⏱ T+1P4target proposed

Head of Infrastructure & Operations·IT System Planning

Change success rate
IT-09
59.4%
Off target-35.6pp vs 95.0%
MANAGEDManageEngine SDP⏱ T+1P4target proposed

Head of Infrastructure & Operations·IT System Planning

Reopened-incident rate
IT-10
46.7%
Off target+41.7pp vs 5.0%
MANAGEDManageEngine SDP⏱ T+1P4target proposed

Head of Infrastructure & Operations·IT System Planning

T24 availability
IT-01
—
No data
no series
UNMEASUREDinfra monitoring○ NOT REPORTEDP4

Head of Infrastructure & Operations·IT System Planning

LOOMS / eKYC availability
IT-02
—
No data
no series
UNMEASUREDinfra monitoring○ NOT REPORTEDP4

Head of Infrastructure & Operations·IT System Planning

DWH / BI / StringeeX availability
IT-03
—
No data
no series
UNMEASUREDinfra monitoring○ NOT REPORTEDP4

Head of Infrastructure & Operations·IT System Planning

COB / EOD batch completion within window
IT-07
—
No data
no series
UNMEASUREDbatch scheduler○ NOT REPORTEDP4target proposed

Head of Infrastructure & Operations·IT System Planning

MTTR by severity
IT-05
2,741.9
No target
MANAGEDManageEngine SDP⏱ T+1P4

Head of Infrastructure & Operations·IT System Planning

Reconciliation match rate
IT-11
63.5%
No target
MANUALPayment GW + T24⏱ T+1P4

Head of Infrastructure & Operations·IT System Planning

STATE OF EVERYTHING AT OR BELOW THIS BOX
  • Off target4
  • No data5
  • No target3