Skip to content
PROTOTYPE — MOCK DATAFigures are generated fixtures derived from the registry. Not ACF actuals.
Menu (13)
IT Infrastructure & Operations
INTERNAL PROCESS · KPI · LEADING

COB / EOD batch completion within windowIT-07

No dataUNMEASURED
ACTUAL VS PLAN
VARIANCE TO PLAN — computed in-platform, not in Excel
DAILY COMPLETION — one cell per day

Weekends render as “no run”, not as failures: legacy T24 cannot post at weekends (a C-Bank dependency). Colouring them red would be a lie.

DEFINITION
Formula
on-time completions ÷ scheduled runs
Unit / direction
pct · higher better
Source system
batch scheduler
Refresh
daily_t1
Target
≥ 99% (inferred)
Target status
PROPOSED BY IKIGAI (T-01)
Baseline in context/
category defined, no target
OWNERSHIP — two roles, two people (R-G-02)
Metric owner — owns the target and the result
Head of Infrastructure & Operations
Data owner — owns the source system and pipeline
IT System Planning

Both proposed by Ikigai and awaiting ACF confirmation (DEC-02).

COMMENTARY — why the number is what it is

No commentary recorded for this metric. A red tile with no explanation is the failure mode the current monthly pack already has.

Commentary is attached to the metric and period, not to a slide. It survives the month — which is what makes a variance reviewable at the next meeting instead of re-argued. Prototype — read-only fixtures; at fullstack this is the COMMENT table with author identity from AD.