DR test currencyIT-12
8.6✕ Off target◇MANUAL
THRESHOLD BANDS — PROPOSED_BY_IKIGAI
DEFINITION
- Formula
- days since last DR test with a recorded result
- Unit / direction
- number · higher better
- Source system
- DR records
- Refresh
- daily_t1
- Target
- ≤ 180 days
- Target status
- From an ACF document
- Baseline in context/
- 6-monthly required; Aug-2026 test has no result in the material
OWNERSHIP — two roles, two people (R-G-02)
Metric owner — owns the target and the result
Head of Infrastructure & Operations
Data owner — owns the source system and pipeline
IT System Planning
Both proposed by Ikigai and awaiting ACF confirmation (DEC-02).
COMMENTARY — why the number is what it is
No commentary recorded for this metric. A red tile with no explanation is the failure mode the current monthly pack already has.
Commentary is attached to the metric and period, not to a slide. It survives the month — which is what makes a variance reviewable at the next meeting instead of re-argued. Prototype — read-only fixtures; at fullstack this is the COMMENT table with author identity from AD.