Skip to content
PROTOTYPE — MOCK DATAFigures are generated fixtures derived from the registry. Not ACF actuals.
Menu (13)
IT Infrastructure & Operations
INTERNAL PROCESS · KPI · LAGGING

LOOMS / eKYC availabilityIT-02

No dataUNMEASURED
ACTUAL VS PLAN
DEFINITION
Formula
uptime ÷ scheduled
Unit / direction
pct · higher better
Source system
infra monitoring
Refresh
daily_t1
Target
NOT COMMITTED
Target status
PROPOSED BY IKIGAI (T-01)
Baseline in context/
99.9%
OWNERSHIP — two roles, two people (R-G-02)
Metric owner — owns the target and the result
Head of Infrastructure & Operations
Data owner — owns the source system and pipeline
IT System Planning

Both proposed by Ikigai and awaiting ACF confirmation (DEC-02).

GUARD METRIC — the check on this number (R-G-06)
Change success rate
IT-09
59.4%
-35.6pp vs target 95.0%
MANAGEDManageEngine SDP⏱ T+1target proposed

Head of Infrastructure & Operations·IT System Planning

A headline KPI is resolved with its guard, so the pairing cannot be forgotten by the UI.

COMMENTARY — why the number is what it is

No commentary recorded for this metric. A red tile with no explanation is the failure mode the current monthly pack already has.

Commentary is attached to the metric and period, not to a slide. It survives the month — which is what makes a variance reviewable at the next meeting instead of re-argued. Prototype — read-only fixtures; at fullstack this is the COMMENT table with author identity from AD.