Partner contract cycle timeBM-01
- Formula
- TO BE DEFINED WITH METRIC OWNER
- Unit / direction
- number · higher better
- Source system
- manual
- Refresh
- daily_t1
- Target
- — none agreed
- Target status
- PROPOSED BY IKIGAI (T-01)
- Baseline in context/
- all partner contracts route BOD → legal → assistant (mgmt)
Both proposed by Ikigai and awaiting ACF confirmation (DEC-02).
- Clause that fired
- no Layer-1, regulatory or agreed-target signal in the registry today
- Share of internal process
- 0.7%
- Of total attention
- 0.18% at the approved weighting
The band is derived, not chosen — a published rule over facts already in the registry, re-runnable with tools/assign_weights.py. It is what the strategy simulator splits a perspective’s weight by, which is why it is not cosmetic: change this band and the shortlist changes. Q-28 asks who at ACF owns the decision.
No commentary recorded for this metric. A red tile with no explanation is the failure mode the current monthly pack already has.
Commentary is attached to the metric and period, not to a slide. It survives the month — which is what makes a variance reviewable at the next meeting instead of re-argued. Prototype — read-only fixtures; at fullstack this is the COMMENT table with author identity from AD.