DR readiness, spring
A second DR rehearsal and a runbook rewrite should lift achieved RTO/RPO.
Recorded 2026-04-14, before the window opened on 2026-05-01. A hypothesis written afterwards is a description, and the difference matters when the result is read.
The window mean does not meet the goal.
Campaign window 2026-05-01 → 2026-07-31 against a baseline of the same length immediately before it, 2026-01-29 → 2026-04-30. The baseline is not chosen — it is derived from the window, so it cannot be picked after the result is known.
| METRIC | BASELINE MEAN | WINDOW MEAN | CHANGE | GOAL |
|---|---|---|---|---|
| Change success rate IT-09 · higher is better | 63.0% 3 pts | 62.5% 3 pts | -0.59pp moved the wrong way | 70.0% |
This campaign declares no guard, and its goal metric carries none in the registry. Where a metric does carry one, the campaign cannot be created without it.
- 1 other campaign ran over part of this window: Consent-capture sprint.
- The window mean is an average of 3 points. One unusual month moves it materially.
- A movement that coincides with a campaign is not a movement caused by it. This platform reports the coincidence and does not attribute it — attribution needs a control group, and there is not one.
The goal of 70 is the campaign’s, not the registry’s. IT-09’s target is still whatever the registry says it is, its threshold is unchanged, and closing this campaign wrote nothing to either. R-G-16.