IT Ops — ManageEngine daily
HEALTHYIT Infrastructure & Operations · production · 1 dataset
WHY THIS FEED EXISTS
The baseline. 90 days, one late window in August that arrived inside grace.
OWNERSHIP (R-G-02)
- Data owner — owns the pipeline
- IT Infrastructure & Operations
- Metric owner — signs the number
- Head of IT Infrastructure
- Classification
- internal
- Created
- 28 May 2026
Two roles, two people, enforced at step 1 of the wizard. A project where both resolve to one person is refused — that is the Sep-2026 defect (a sales KPI owned by IT) closed at the door.