← Operations Department
INTERNAL PROCESS · KPI · LEADING
Maker/checker SLA adherenceOP-02
46.0%✕ Off target◇MANUAL
ACTUAL VS PLAN
VARIANCE TO PLAN — computed in-platform, not in Excel
DEFINITION
- Formula
- steps within SLA ÷ steps
- Unit / direction
- pct · higher better
- Source system
- LOOMS
- Refresh
- daily_t1
- Target
- ≥ 95% (inferred)
- Target status
- PROPOSED BY IKIGAI (T-01)
- Baseline in context/
- —
OWNERSHIP — two roles, two people (R-G-02)
Metric owner — owns the target and the result
Head of Operations Department
Data owner — owns the source system and pipeline
IT System Development
Both proposed by Ikigai and awaiting ACF confirmation (DEC-02).
GUARD METRIC — the check on this number (R-G-06)
4,635.5
Off target
MANUALT24 + PGW⏱ T+1
Head of Operations Department·IT System Planning
A headline KPI is resolved with its guard, so the pairing cannot be forgotten by the UI.
COMMENTARY — why the number is what it is
No commentary recorded for this metric. A red tile with no explanation is the failure mode the current monthly pack already has.
Commentary is attached to the metric and period, not to a slide. It survives the month — which is what makes a variance reviewable at the next meeting instead of re-argued. Prototype — read-only fixtures; at fullstack this is the COMMENT table with author identity from AD.