← Corporate Governance
INTERNAL PROCESS · KRI · LAGGING
Operational-risk loss eventsCG-08
1435.6%— No target◇MANUAL
ACTUAL VS PLAN
DEFINITION
- Formula
- events and value per month
- Unit / direction
- pct · lower better
- Source system
- manual
- Refresh
- daily_t1
- Target
- bands TBC
- Target status
- PROPOSED BY IKIGAI (T-01)
- Baseline in context/
- usable loss data only from ~end-2025 against a ~10-year requirement
OWNERSHIP — two roles, two people (R-G-02)
Metric owner — owns the target and the result
Head of Corporate Governance
Data owner — owns the source system and pipeline
IT System Planning
Both proposed by Ikigai and awaiting ACF confirmation (DEC-02).
COMMENTARY — why the number is what it is
No commentary recorded for this metric. A red tile with no explanation is the failure mode the current monthly pack already has.
Commentary is attached to the metric and period, not to a slide. It survives the month — which is what makes a variance reviewable at the next meeting instead of re-argued. Prototype — read-only fixtures; at fullstack this is the COMMENT table with author identity from AD.