PROTOTYPE — MOCK DATAFigures are generated fixtures derived from the registry. Not ACF actuals.
Menu (13)
CREATE AN INTEGRATION PROJECT
Six steps, three of which can refuse you
The evaluation question is I1: could a department data owner get through this and complete a successful sandbox push without calling IT? Three steps can stop you, and each refusal names what to do instead — 20 of 140 metrics already have a producer and will be greyed out in step 2, which is the rule that keeps one number from having two sources.
STEP 1 OF 6
Who owns this feed
Two roles, two people. A project where both resolve to one person is refused here rather than discovered in an audit — this is the Sep-2026 defect (a sales KPI owned by IT) closed at the door.
8 projects exist today. Nothing is created by this wizard — it is the shape of the flow, built so the refusals can be judged before the backend implements them in S6.